(1)
The Henry Borden Hydroelectric Plant As Heritage and Rectification of the TietĂȘ and Pinherios Rivers With Their Dislike. MA 2016, 11 (11), 53-64. https://doi.org/10.35494/ffyl.ma.29544297e.2016.11.11.198.