“The Henry Borden Hydroelectric Plant As Heritage and Rectification of the Tietê and Pinherios Rivers With Their Dislike”. 2016. Mirada Antropológica 11 (11): 53-64. https://doi.org/10.35494/ffyl.ma.29544297e.2016.11.11.198.