[1]
“The Henry Borden hydroelectric plant as heritage and rectification of the Tietê and Pinherios rivers with their dislike”, MA, vol. 11, no. 11, pp. 53–64, Jul. 2016, doi: 10.35494/ffyl.ma.29544297e.2016.11.11.198.