“The Henry Borden Hydroelectric Plant As Heritage and Rectification of the Tietê and Pinherios Rivers With Their Dislike”. Mirada Antropológica 11, no. 11 (July 22, 2016): 53–64. Accessed October 15, 2026. https://miradaantrop.buap.mx/index.php/revista/article/view/198.